Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Bower, D A (2000) A systematic approach to the evaluation of indirect costs of contract variations. Construction Management and Economics, 18(03), 263-8.

Cheung, S-O, Tam, C M, Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(03), 281-94.

  • Type: Journal Article
  • Keywords: discriminant analysis; disputes; Hong Kong; project
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461900370654
  • Abstract:

    The use of project dispute resolution satisfaction (DRS) as a project success measurement responds to the increasing concern over the spread of the dispute epidemic within the construction industry in Hong Kong. The DRS of a project is considered as favourable where disputes are resolved within the site level. With the use of 48 project data sets and the technique of multivariate discriminant analysis, a discriminant model function was derived to classify projects into favourable DRS and adverse DRS. The multivariate discriminant analysis model function identified eight discriminating variables, among which the degree of design changes offered the highest separation power. The reliability of the discriminating variables was reinforced by a separate relative importance index study. Through the use of principal component factor analysis, these variables were grouped into three factors generically described as substantive influence, facilitation and indirect influence.

Hooper, A and Nicol, C (2000) Design practice and volume production in speculative housebuilding. Construction Management and Economics, 18(03), 295-310.

Lai, L W C (2000) The Coasian market-firm dichotomy and sub-contracting in the construction industry. Construction Management and Economics, 18(03), 355-62.

Love, P E D, Li, H, Irani, Z and Faniran, O (2000) Total quality management and the learning organization: a dialogue for change in construction. Construction Management and Economics, 18(03), 321-31.

Ofori, G (2000) Globalization and construction industry development: research opportunities. Construction Management and Economics, 18(03), 257-62.

Ozdogan, I D and Birgonul, M T (2000) A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects. Construction Management and Economics, 18(03), 343-53.

Rogers, M (2000) Using Electre III to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(03), 333-42.

Slaughter, E S and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(03), 269-80.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(03), 363-72.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(03), 311-20.